First page Back Continue Last page Overview Graphics
Power Baseload.
One engine running 24/7;
Secondary engine to run during daytime hours;
Generators are each linked to an absorption chiller, generating chilled water and hot water;
The run time of generators and chillers corresponds with the user precinct’s usage requirements;
Reduces maximum KVA demand;
Reduces Electrical consumption on heating and cooling.